Skip to content
The finished wet area: separate toilet, vanity unit below a round illuminated mirror and an onyx-effect tiled shower.

Bathroom renovation in Paris

TIMSTROY renovates and creates bathrooms and shower rooms in apartments and houses in Paris and the inner suburbs. A level-access shower, a well-lit basin, storage within reach: before choosing the materials, we check everything that will be hidden once the room is finished.

  • Paris and the inner suburbs
  • Coordinated trades
The finished wet area: separate toilet, vanity unit below a round illuminated mirror and an onyx-effect tiled shower.

What happens beneath the tiles

A good bathroom is first recognised by what you no longer see: water goes where it is meant to, the air is renewed and equipment is safely supplied. These points are settled before the tiles are chosen.

  • Waterproofing under tiles: a waterproof layer protects the substrate and floor, on the floor and the exposed shower walls, with reinforcement at corners and around pipe penetrations.
  • Drainage: each fitting joins the waste stack with a steady fall; the further it is from the stack, the harder that fall is to achieve, especially for a toilet.
  • Water supplies: the condition of the pipes and access to the shut-off valves are checked before the walls are closed.
  • Ventilation: a wet room must remove its moisture; without enough extraction, condensation gradually damages grout and paintwork.
  • Electrics: sockets, lighting and illuminated mirrors are positioned according to the safety zones the NF C 15-100 standard defines around the shower and bath.

Level-access shower: a question of height

A shower without an upstand needs space beneath the floor for the fall and the trap. In an existing floor, the available depth decides: recess the drain, raise the floor slightly or fit a low-profile shower tray. A timber floor cannot be cut into like a concrete slab; this is checked on site, sometimes after opening up a test area. In this living room renovated in Paris, the shower sits on a low-profile tray; large onyx-effect tiles run up to the ceiling and continue across the wet-area floor, behind a smoked-glass screen.

Creating or moving a shower room

Adding a shower to a bedroom, moving the toilet closer to the bathroom, adding a basin: feasibility depends on the building services. Drainage must reach a stack with a sufficient fall, water must be brought in and the room connected to ventilation. In a co-owned building, the co-ownership rules may also govern these changes. The wet area can open onto the room, with a separate toilet, as in the project above. We check these conditions on site, before the quote.

How your works unfold

A bathroom brings several trades into a few square metres: plumber, electrician, tiler, painter. Your project manager coordinates their work, from the on-site consultation to handover. To compare proposals, read our guide to reading a renovation quote.

  • Free on-site consultation: we look at the room, the existing services and how you use it.
  • Detailed quote: works, quantities and materials, options priced separately and a schedule agreed before work begins.
  • Dedicated project manager: regular visits and weekly reports with photos, including during the stages that will later be covered.
  • Checked handover: finishes and equipment operation checked with you, any snags recorded.
  • After handover: 12 months of adjustments and touch-ups included, on top of statutory guarantees.

Projects in this field

All projects

Frequently asked questions

Do I need the co-owners’ approval to redo a bathroom?

Redoing a bathroom within private areas generally does not require an owners’ meeting vote, subject to the co-ownership rules. Altering a shared riser, waste stack or communal ventilation (VMC) affects common areas, however: it is prepared with the building manager and in principle requires approval from the general meeting of co-owners. Replacing parquet with tiles can also change the noise transmitted to the neighbour below; some co-ownership rules regulate this.

Can a bath be replaced with a shower?

A bath can be replaced with a shower when the drainage and the depth available beneath the floor allow it. The position of the stack, the type of floor and the waterproofing to be redone guide the choice between a level-access shower and a shower tray. We review this during the on-site consultation.

Do the pipes need replacing?

Whether pipes need replacing depends on their condition, their material and the new layout. A renovation is often the right time to replace ageing pipes, since the walls and floor are open. Lead water pipes, still found in some older buildings, should be replaced.

How long does a bathroom renovation take?

Duration depends on the extent of the works, the condition of surfaces and services, and delivery times for the chosen equipment. Drying times, from levelling compound to waterproofing and grout, are part of it. The schedule is agreed before work begins and sets out each stage.

Can I stay in my home during the works?

Staying in your home during a bathroom renovation depends mainly on the other sanitary facilities available. If the only bathroom or toilet is being renovated, an alternative is needed for that period. Short water cut-offs occur during connections. We review this and the phasing during the visit.

Let’s discuss your works.

Reply within two working days · free on-site consultation

Request a quote